A Leader In Mass Transfer Tower Packing Since 1988. - JIANGXI KELLEY CHEMICAL PACKING CO., LTD

Factory selling Industrial Tower Packing - Ceramic Super Intalox Saddle for tower packing – Kelley


Product Detail

Product Tags

Related Video

Feedback (2)

"Sincerity, Innovation, Rigorousness, and Efficiency" may be the persistent conception of our organization for that long-term to establish jointly with customers for mutual reciprocity and mutual gain for Industrial Ceramic Cross Ring , 30% Inert Alumina Ceramic Ball , Lab Dixon Ring , In case you are intrigued in almost any of our merchandise, remember to will not hesitate to make contact with us and take the initial step to create up a prosperous enterprise romance.
Factory selling Industrial Tower Packing - Ceramic Super Intalox Saddle for tower packing – Kelley Detail:

Application

Ceramic Super Intalox Saddle with excellent acid resistance and heat resistance. it is widely used in the scrubbing tower, dry tower, absorb tower, colling tower, those are used in chemical, metallurgical, gas, oxygen,medicine, acid, fertilizer and so on.

Technical Data

SiO2 + Al2O3 >92% CaO <1.0%
SiO2 >76% MgO <0.5%
Al2O3 >17% K2O+Na2O <3.5%
Fe2O3 <1.0% Other <1%

Physical & Chemical Properties

Water absorption <0.5% Moh’s hardness >6.5 scale
Porosity (%) <1 Acid resistance >99.6%
Specific gravity 2.3-2.40 g/cm3 Alkali resistance >85%
Max Operation temp 950~1100℃

Dimension And Other Physical Properties

Size

Thickness

(mm)

Specific Surface

(m2/m3)

Void Volume

(%)

Bulk Numbers

(Pcs/m3)

Package Density

(kg/m3)

25mm

3-3.5

160

78

53000

650

38mm

4-5

102

80

16000

600

50mm

5-6

88

80

7300

580

76mm

8.5-9.5

58

82

1800

550

Remark: 3Inch US size standard type are available,other size can be produced by customized.

Packaging & Shipping

Package Type

Container Load Capacity

20 GP

40 GP

40 HQ

Ton bag put on pallets

20-22m3

40-42 m3

40-44 m3

Plastic 25kg bags put on pallets           with film

20 m3

40 m3

40 m3

Plastic 25kg bags load into wooden case

20 m3

40 m3

40 m3

Delivery time

Within 7 working days (For common type)

10 working days  (For common type)

10 working days   (For common type)


Product detail pictures:

Factory selling  Industrial Tower Packing  - Ceramic Super Intalox Saddle for tower packing – Kelley detail pictures

Factory selling  Industrial Tower Packing  - Ceramic Super Intalox Saddle for tower packing – Kelley detail pictures

Factory selling  Industrial Tower Packing  - Ceramic Super Intalox Saddle for tower packing – Kelley detail pictures


Related Product Guide:

Our team through professional training. Skilled professional knowledge, strong sense of service, to meet the service needs of customers for Factory selling Industrial Tower Packing - Ceramic Super Intalox Saddle for tower packing – Kelley, The product will supply to all over the world, such as: New Zealand, Spain, Muscat, By continuous innovation, we will provide you with more valuable products and services, and also make a contribution for the development of the automobile industry at home and abroad. Both domestic and foreign merchants are strongly welcomed to join us to grow together.
  • Managers are visionary, they have the idea of "mutual benefits, continuous improvement and innovation", we have a pleasant conversation and Cooperation.
    5 Stars By Moira from The Swiss - 2018.09.23 18:44
    The company account manager has a wealth of industry knowledge and experience, he could provide appropriate program according our needs and speak English fluently.
    5 Stars By Tyler Larson from Benin - 2018.03.03 13:09

    Related Products