A Leader In Mass Transfer Tower Packing Since 1988. - JIANGXI KELLEY CHEMICAL PACKING CO., LTD

New Arrival China Flue Gas Desulfurization - Ceramic Super Intalox Saddle for tower packing – Kelley


Product Detail

Product Tags

Related Video

Feedback (2)

We have the most advanced production equipment, experienced and qualified engineers and workers, recognized quality control systems and a friendly professional sales team pre/after-sales support for Ceramic Saddle Random Packing , Mbbr , Ceramic Ball China , In a word, when you choose us, you choose a perfect life. Welcome to visit our factory and welcome your order! For further inquiries, please do not hesitate to contact us.
New Arrival China Flue Gas Desulfurization - Ceramic Super Intalox Saddle for tower packing – Kelley Detail:

Application

Ceramic Super Intalox Saddle with excellent acid resistance and heat resistance. it is widely used in the scrubbing tower, dry tower, absorb tower, colling tower, those are used in chemical, metallurgical, gas, oxygen,medicine, acid, fertilizer and so on.

Technical Data

SiO2 + Al2O3 >92% CaO <1.0%
SiO2 >76% MgO <0.5%
Al2O3 >17% K2O+Na2O <3.5%
Fe2O3 <1.0% Other <1%

Physical & Chemical Properties

Water absorption <0.5% Moh’s hardness >6.5 scale
Porosity (%) <1 Acid resistance >99.6%
Specific gravity 2.3-2.40 g/cm3 Alkali resistance >85%
Max Operation temp 950~1100℃

Dimension And Other Physical Properties

Size

Thickness

(mm)

Specific Surface

(m2/m3)

Void Volume

(%)

Bulk Numbers

(Pcs/m3)

Package Density

(kg/m3)

25mm

3-3.5

160

78

53000

650

38mm

4-5

102

80

16000

600

50mm

5-6

88

80

7300

580

76mm

8.5-9.5

58

82

1800

550

Remark: 3Inch US size standard type are available,other size can be produced by customized.

Packaging & Shipping

Package Type

Container Load Capacity

20 GP

40 GP

40 HQ

Ton bag put on pallets

20-22m3

40-42 m3

40-44 m3

Plastic 25kg bags put on pallets           with film

20 m3

40 m3

40 m3

Plastic 25kg bags load into wooden case

20 m3

40 m3

40 m3

Delivery time

Within 7 working days (For common type)

10 working days  (For common type)

10 working days   (For common type)


Product detail pictures:

New Arrival China  Flue Gas Desulfurization  - Ceramic Super Intalox Saddle for tower packing – Kelley detail pictures

New Arrival China  Flue Gas Desulfurization  - Ceramic Super Intalox Saddle for tower packing – Kelley detail pictures

New Arrival China  Flue Gas Desulfurization  - Ceramic Super Intalox Saddle for tower packing – Kelley detail pictures


Related Product Guide:

To fulfill the customers' over-expected fulfillment , we have now our solid staff to deliver our greatest general assistance which includes internet marketing, product sales, creating, manufacturing, excellent controlling, packing, warehousing and logistics for New Arrival China Flue Gas Desulfurization - Ceramic Super Intalox Saddle for tower packing – Kelley, The product will supply to all over the world, such as: Zimbabwe, Melbourne, Mumbai, The best and original quality for spare parts is a most important factor for transportation. We may stick on supplying original and good quality parts even a little profit earned. God will bless us to do kindness business forever.
  • The quality of the products is very good, especially in the details, can be seen that the company work actively to satisfy customer's interest, a nice supplier.
    5 Stars By tobin from Korea - 2018.10.01 14:14
    The factory workers have rich industry knowledge and operational experience, we learned a lot in working with them,we are extremely grateful that we can encount a good company has excellent wokers.
    5 Stars By Carey from Swiss - 2018.06.21 17:11

    Related Products